Cases

时间 2025-03-25 浏览量 38

10014.jpg



The Ningju Intercity Line has a total length of 43.642 kilometers and has a total of 13 stations. The line passes through Qixia District, Jiangning District, and Jurong City. The line starts from Maqun Station in the west, runs east to Zidong Area, reaches Tangquan West Station and enters Tangshan New City, turns from Tangshan Station to southeast, and then turns south to Jurong Urban area, and ends south at Jurong Station of the High-speed Railway along the Yangtze River.


As the first cross-city subway line built by Nanjing Metro, the opening of Ningju intercity will greatly facilitate transportation between Nanjing and Jurong, shorten the distance between urban agglomerations, and boost the economic development of the two places.


The smooth opening of Ningju Intercity also marks that Weiman Doors has contributed another contribution to the construction of Nanjing Metro and the integration of the "Nanjing Metropolitan Area".


Return to List