The total length of the first phase of Chongqing Rail Transit Line 10 is about 34.28km. The first phase of the line starts from Liyuchi Station on the east side of Chang'an Factory Gate on Jianxin East Road in Jiangbei District, passes through Jianxin East Road and Wuhong Road to reach Longtousi Park, and continues north to connect the south square and north square of Chongqing Railway North Station. The line turns northeast at the East Ring Interchange, passes through Minxin Jiayuan, passes through Jinshi Avenue, Shangwan Road, Food City Avenue, and Lianggang Avenue, and then turns to an above ground elevated layout, connects to Zhujiawan Depot, and then goes north to Chongqing Jiangbei International Airport. It enters the underground and sets up Jiangbei Airport T3 Terminal Station and Jiangbei Airport T2 Terminal Station. After that, the line turns west and passes through the two urban areas. Afterwards, the line runs westward along Tongmao Avenue, passes through Central Park, and arrives at Yuelai Station on the National Expo Line of the rail transit. After that, the line turns north, Arrive at Wangjiazhuang Station and connect to Wangjiazhuang Parking Lot. There are a total of 19 stations, including 18 underground stations and 1 elevated station, with an average station spacing of about 1.74km. The project was completed and opened to traffic on December 28, 2017.